Schrägkabelbrücken

40 Jahre Erfahrung weltweit - Mit 2 DVD-Videos

89,00 €
(inkl. MwSt.)
In den Warenkorb

Nicht lieferbar

Bibliografische Daten
ISBN/EAN: 9783433029770
Sprache: Deutsch
Umfang: 458 S., 378 s/w Illustr., 887 farbige Illustr., 12
Format (T/L/B): 3.4 x 30.1 x 21.7 cm
Auflage: 1. Auflage 2011
Einband: gebundenes Buch

Beschreibung

The need for large-scale bridges is constantly growing due to the enormous infrastructure development around the world. Since the 1970s many of them have been cable-stayed bridges. In 1975 the largest span length was 404 m, in 1995 it increased to 856 m, and today it is 1088 m. Thus the economically efficient range of cable-stayed bridges is tending to move towards even larger spans, and cable-stayed bridges are increasingly the focus of interest worldwide. This book describes the fundamentals of design analysis, fabrication and construction, in which the author refers to 250 built examples to illustrate all aspects. International or national codes and technical regulations are referred to only as examples, such as bridges that were designed to German DIN, AASHTO, British Standards, etc. The chapters on cables and erection are a major focus of this work as they represent the most important difference from other types of bridges. The examples were chosen from the bridges in which the author was personally involved, or where the consulting engineers, Leonhardt, Andrä und Partner (LAP), participated significantly. Other bridges are included for their special structural characteristics or their record span lengths. The most important design engineers are also presented. Note: The lecture videos which are attached to the print book on DVD are not part of the e-book.

Autorenportrait

Holger Svensson's name stands for 40 years of large-scale bridge construction the world over. He obtained his diploma from Stuttgart University and, since 1972, has worked with the world-famous Fritz Leonhardt. At LAP, Dipl.-Ing. Holger Svensson, P.E., PEng, CEng, FICE, FIStructE, MHKIE, RPEQ, T.P.Eng has been active as structural engineer, project manager and chief engineer, and from 1992 to 2010 as Managing Director and Chairman of the Board. He has been responsible for the design analysis, construction engineering and checking of cable-stayed bridges around the world, e.g. the Pasco-Kennewick Bridge over the Columbia River, USA, and the Helgeland Bridge over Leirfjord, Norway. Since 2010 he has been a lecturer at Dresden University where he teaches all aspects of the design and construction of cable-stayed bridges. Holger Svensson is currently a vice-president of the International Association for Bridge and Structural Engineering (IABSE).

Leseprobe

Leseprobe

Inhalt

INTRODUCTION Design fundamentals Aesthetic design guidelines THE DEVELOPMENT OF CABLE-STAYED BRIDGES Precursors and historic development ? cable-stayed bridges with concrete decks ? cable-stayed bridges with composite decks ? unusual structures CABLES Fully locked cables ? parallel bar cables ? parallel wire cables ? parallel strand cables ? corrosion protection ? manufacturing ? monitoring ? cable anchorages ? cable design ? cable dignamics ? cable erection PRELIMINARY DESIGN Analysis using simplified systems ? analysis of overall structural systems ? bridge dynamics ? ship impact considerations ? design examples ERECTION Erection examples ? erection analysis BUILT EXAMPLES Precast concrete decks ? Pasco-Kennewick Bridge ? East Huntington Bridge ? bridges with in-situ concrete decks: Helgeland Bridge ? bridges with steel decks: Strelasund Bridge ? bridges with composite decks: Baytown Bridge ? bridges with hybrid decks: Normandy Bridge ? multiple-span bridges ? Millau Viaduct ? Rion-Antirion Bridge DVD of lectures recorded at the Technical University of Dresden